How Long Does Delivery and Installation Take for a Carousel Ride?
When purchasing a carousel ride for your amusement park, one of the most important questions is: how long will delivery and installation take? Understanding the timeline helps park operators plan openings, marketing, and investment schedules more effectively.
This article will guide you through the typical delivery process, installation steps, and factors that can affect the overall timeline.

1. Production Time of a Carousel Ride
The first stage is manufacturing. At HOTFUN, we only sell brand-new carousels (no second-hand or rentals). Depending on the size and customization level:
- Mini carousel (3–8 seats): 15–25 days
- Medium carousel (12–24 seats): 25–40 days
- Large or double-deck carousel: 45–60 days
- Fully customized themed carousel: 60–90 days
👉 Tip: Ordering in off-peak seasons may shorten production time.
2. Shipping and Delivery Time
Shipping depends heavily on the buyer’s location. Carousels are usually transported in 20ft or 40ft containers.
- Southeast Asia: 7–15 days
- Middle East: 20–30 days
- Europe: 25–35 days
- Africa: 30–40 days
- South America: 35–45 days
On average, shipping adds 2–6 weeks to the timeline.
3. Installation Time
Once the carousel arrives at the site, installation begins. HOTFUN provides professional engineers for overseas installation or remote guidance. Typical installation times are:
- Mini carousel: 2–3 days
- Medium carousel: 5–7 days
- Large or double-deck carousel: 10–15 days
This includes assembly, electrical setup, testing, and safety inspection.
4. Factors That Affect the Timeline
Several elements can influence delivery and installation:
- Customization level – Unique themes and designs require more production time.
- Shipping season – Global freight rates and transit times may fluctuate.
- Customs clearance – Documentation and local inspections can cause delays.
- Site preparation – Foundation and electrical work should be completed before installation.
5. HOTFUN’s Advantage
As a global carousel ride manufacturer, HOTFUN ensures a smooth and predictable delivery process:
- ✅ Strict production schedule with real-time updates
- ✅ Professional packing and logistics support
- ✅ Overseas installation team or video guidance
- ✅ After-sales service and warranty included
Conclusion
From production to installation, the total timeline for a carousel ride usually ranges from 6–12 weeks, depending on size, customization, and shipping distance. By planning early and working with a reliable manufacturer like HOTFUN, park operators can launch their attractions on time and avoid unnecessary delays.
Related recommendations
-
Maintenance and Maintenance Requirements for Ferris Wheels
959Ferris wheels are iconic structures that provide breathtaking views from great heights. They are popular attractions at amusement parks, fairs, and tourist destinations. However, due to the complexity of their design and the safety risks involved...
View details -
How do we choose the right amusement equipment?
1789Choosing the right rides is one of the important steps in building a theme park or amusement park. Here are some considerations to help you choose the right ride: Target Audience: Determine what age group your primary target audience is, su...
View details -
How Does a Swing Carousel Work? Understanding the Mechanism and Benefits
339Discover how a swing carousel works and why it’s a top family-friendly attraction. HOTFUN provides brand-new, customizable swing carousels with safe, reliable, and factory-direct solutions for theme parks and entertainment venues worldwide.
View details -
Choosing Between Local Dealers and Global Amusement Facility Suppliers: Which Is Better?
298Should you buy amusement rides from local dealers or global suppliers? Compare product variety, safety standards, costs, and after-sales support to choose the best option for your park.
View details
chinaparkrides





Leave a Reply