How Long Does Delivery and Installation Take for a Carousel Ride?
When purchasing a carousel ride for your amusement park, one of the most important questions is: how long will delivery and installation take? Understanding the timeline helps park operators plan openings, marketing, and investment schedules more effectively.
This article will guide you through the typical delivery process, installation steps, and factors that can affect the overall timeline.

1. Production Time of a Carousel Ride
The first stage is manufacturing. At HOTFUN, we only sell brand-new carousels (no second-hand or rentals). Depending on the size and customization level:
- Mini carousel (3–8 seats): 15–25 days
- Medium carousel (12–24 seats): 25–40 days
- Large or double-deck carousel: 45–60 days
- Fully customized themed carousel: 60–90 days
👉 Tip: Ordering in off-peak seasons may shorten production time.
2. Shipping and Delivery Time
Shipping depends heavily on the buyer’s location. Carousels are usually transported in 20ft or 40ft containers.
- Southeast Asia: 7–15 days
- Middle East: 20–30 days
- Europe: 25–35 days
- Africa: 30–40 days
- South America: 35–45 days
On average, shipping adds 2–6 weeks to the timeline.
3. Installation Time
Once the carousel arrives at the site, installation begins. HOTFUN provides professional engineers for overseas installation or remote guidance. Typical installation times are:
- Mini carousel: 2–3 days
- Medium carousel: 5–7 days
- Large or double-deck carousel: 10–15 days
This includes assembly, electrical setup, testing, and safety inspection.
4. Factors That Affect the Timeline
Several elements can influence delivery and installation:
- Customization level – Unique themes and designs require more production time.
- Shipping season – Global freight rates and transit times may fluctuate.
- Customs clearance – Documentation and local inspections can cause delays.
- Site preparation – Foundation and electrical work should be completed before installation.
5. HOTFUN’s Advantage
As a global carousel ride manufacturer, HOTFUN ensures a smooth and predictable delivery process:
- ✅ Strict production schedule with real-time updates
- ✅ Professional packing and logistics support
- ✅ Overseas installation team or video guidance
- ✅ After-sales service and warranty included
Conclusion
From production to installation, the total timeline for a carousel ride usually ranges from 6–12 weeks, depending on size, customization, and shipping distance. By planning early and working with a reliable manufacturer like HOTFUN, park operators can launch their attractions on time and avoid unnecessary delays.
Related recommendations
-
Beyond Thrills: Uncovering the Safety Technology and Innovation Engine of Top Large-Scale Amusement Rides Manufacturers | [HOTFUN]
393Meta description: How do large-scale amusement rides ensure absolute safety and continue to attract visitors? [Your Company Name] shares core technologies: advanced simulation, intelligent monitoring, durable materials and immersive innovation. Le...
View details -
Types of Trackless Tourist Trains
922Trackless tourist trains have become a popular and efficient way for visitors to explore large parks, scenic areas, and other attractions. Without the need for a traditional railway track, these vehicles can move freely over various types of terr...
View details -
Trackless Train vs. Mini Rail Train: Which Is Better for Your Amusement Center?
205Compare trackless trains and mini rail trains for amusement centers. Learn about purchase cost, installation, maintenance, flexibility, and which train type suits your park best. Get expert advice from HOTFUN.
View details -
Title: Heavy-Duty Amusement Ride Manufacturer – Engineering Thrills for Global Attractions
455Global manufacturer of heavy-duty amusement rides – roller coasters, water slides & custom mechanical attractions. EN13814-certified, IoT-enabled, full lifecycle support. Request specs!
View details
chinaparkrides





Leave a Reply